The Risk Profile
Product diversion, intellectual property exposure, sample and material chain-of-custody, and environmental excursion in controlled storage. The unusual feature of this sector is that a documentation failure can be as consequential as an actual loss.
Layered Access
Facilities are zoned, and credentials follow the zoning: general office, then production and lab, then cleanroom and gowning, then vault and controlled storage. Each boundary is a credentialed door with individual accountability. For vaults and high-value storage we deploy dual authorization — two enrolled individuals within a short window — which eliminates most single-actor diversion risk. Biometrics belong on these interior doors, not on the busy main entrance.
Environmental Monitoring as a Compliance Record
Temperature, humidity and differential pressure monitoring in controlled storage needs continuous logging with exportable records, not just an alert. The log is what demonstrates compliance during an inspection. We size retention and reporting to the requirement you are actually held to, and configure alerting so an excursion reaches a monitored central station rather than an unread phone notification at 3 a.m.
Chain of Custody
Camera coverage of receiving, sample handling, weighing, packaging and waste disposal creates a visual record that pairs with your written chain of custody. Waste and destruction points are the most commonly under-covered area we find, and also the most common diversion route.
Cleanroom Considerations
Camera and reader hardware in classified spaces must be selected for cleanability and material compatibility, mounted to avoid disrupting airflow, and installed without compromising pressure boundaries. Cable penetrations require proper sealing. These constraints have to be resolved at design, not discovered during installation.
Recording Integrity
Accurate synchronized timestamps, continuous rather than motion-triggered recording in controlled areas, exportable formats an investigator can open, and encrypted off-site copies so a stolen or failed recorder does not erase the record. We verify retention after commissioning rather than trusting a spec sheet.